NTPC declares another 95.6 MW of Kalasar solar capacity commercial
NTPC has declared a further 95.6 MW of the Kalasar solar project commercially operational from midnight on 30 October.

Edivro Company News · Original attributed summary. Source announcement: 2026-10-30.
NTPC has declared a further 95.6 MW of the Kalasar solar project commercially operational from midnight on 30 October. The project is in Bikaner, Rajasthan.
The stock-exchange filing identifies this as the fifth part of the project’s 650 MW solar component, under the 500 MW REMCL round-the-clock programme. NTPC Renewable Energy is developing it through the NTPC Green Energy group structure.
The declaration concerns the specified 95.6 MW tranche, not commissioning of the entire 650 MW solar component. NTPC says group installed capacity consequently stood at 91,668 MW, with commercial capacity of 90,588 MW.
How much capacity was newly declared commercial?
The filing identifies a 95.6 MW tranche.
Does this represent the full 650 MW component?
No. NTPC identifies it as the fifth part capacity.
Source: Original announcement.
Questions about this story
These answers summarise the article and refer to its original reporting period.
How much capacity was newly declared commercial?
The filing identifies a 95.6 MW tranche.
Does this represent the full 650 MW component?
No. NTPC identifies it as the fifth part capacity.
Publisher
Haruto Mori · Edivro editorial pen name


